Coal Preparation Plant / 选煤厂
  • Daliuta Coal Preparation Plant of Shenhua Shendong Coal Group Co.,Ltd

    Located in Daliuta, Shenmu, Shaanxi Province, it is affiliated to Shenhua Shendong Coal Group Co.,Ltd. Its production capacity is 34.0Mt/a thermal coal. The washing process uses jigging, heavy medium shallow groove, heavy medium cyclone, spiral separation, slurry pressure and pressure filter recovery. The main equipment are imported, and the main plant adopts modular design. It is a classic work of super large power coal preparation plant.

  • Heidaigou Open-pit Coal Mine Coal Preparation Plant of Shenhua Group Zhungeer Energy Co.,Ltd

    Located in Jungar Banner of Inner Mongolia, it is affiliated to Shenhua Group Zhungeer Energy Co., Ltd. with a capacity of 30.0Mt/a thermal coal. The washing process uses heavy medium shallow groove and coal slime filtration recovery. The technology is simple and practical, the main plant adopts the steel frame ladder layout, and product tank storage. It is a typical project of the auxiliary coal preparation plant of the super large open pit coal mine.

  • Bultai Coal Preparation Plant of Shenhua Shendong Coal Group Co.,Ltd.

    Located in Ejin Horo Banner, Inner Mongolia, it is affiliated to Shenhua Shendong Coal Group Co., Ltd., with a production capacity of 31.0Mt/a thermal coal. The washing process uses heavy medium shallow groove, heavy medium cyclone, TBS separation, coal slime pressure filtration, sedimentation, pressure filtration recovery. The main plant adopts modular design. It is a representative work of super large power coal preparation plant.

  • Central Coal Preparation Plant of Inner Mongolia Shanghai Miao Coking Park

    Located in Otog Front Banner, Inner Mongolia, it is affiliated to Inner Mongolia Energy Co., Ltd.of Shandong Energy Xinwen Group, with a capacity of 10.0Mt/a coking coal. The washing process adopts movable sieve jigger, primary and second heavy medium cyclone, TBS and flotation column. The main plant adopts modular design. It is representative work of a large-scale group coal mines coking coal preparation plant.

  • Zhaozhuang Coal Mine Preparation Plant of Shanxi Jincheng Anthracite Mining Group

    Located in Changzi County, Shanxi Province, it is affiliated to Jincheng Anthracite Mining Group, with a  capacity of 10.0Mt/a anthracite. The washing process uses heavy medium shallow groove, heavy medium cyclone, spiral, TCS separation, slime pressure filtration, drying and recovery. The main plant adopts modular design, and the process is flexible. It is the representative work of large anthracite coal preparation plant.


  • Selian No. 2 Mine Coal Preparation Plant of Zhongbei Coal Chemical Co., Ltd.

    Located in Erdos City, Inner Mongolia, it is affiliated to Huainan Mining Group with a capacity of 10.0Mt/a thermal coal. The washing process uses heavy medium shallow groove, heavy medium cyclone, slurry sedimentation and pressure filtration recovery. It is the first newly-built large-scale thermal coal preparation plant in China that directly adopts the deep screening washing process, which has important practical significance.

Total 2 Pages First Page Prev 1 2 Next Last Page
Policies Regulations
More >>

About Us

Dadi Engineering Development (Group) Co., Ltd. (hereinafter referred to as Dadi Company) was established in 1995. It was a Sino-Australian joint venture approved and registered by the former Ministry of Foreign Trade and Economic Cooperation of China, and belonged to the former Ministry of Coal Industry. In 2007, Reform into a joint stock company with a registered capital of 110.068609 million yuan.